More Virtual Server Performance Tips
Saturday, 11 June 2005 by Michel Roth
Virtualization is the process of dividing a physical server to run more workloads and increase efficiency of the physical hardware. If you decide to consolidate the workloads of 20 physical servers onto a single physical server running virtualization, what are the affects of that process? The result of this consolidation is that 20 physical servers, which used to have their own dedicated I/O for CPU, memory, disk and network, are now running on a single server where these 20 workloads are now sharing I/O for CPU, memory, disk and network. Numerous potential bottlenecks have just been created. The good news is that modern server hardware is very fast and there are many techniques to help mitigate these bottlenecks. But, the key to a successful virtualization experience is to understand and alleviate these bottlenecks.

Read it all here.

Related Items:

Double-Take For Virtual Systems (13 February 2006)
Microsoft Announces Virtual Machine Manager Beta 2 (27 March 2007)
In-Depth Guide: Server Consolidation Via Virtualization (13 August 2006)
Using p2v As A Backup Solution (29 February 2008)
6 Hot Technologies For 2006: Virtualization (13 January 2006)
Live View (1 September 2006)
The Virtues Of Virtualization (21 December 2006)
BriForum Sessions Details Available (30 August 2006)
Virtualization: The Evolution (31 July 2006)
VMWare P2V Process (26 June 2006)
Comments (0)add feed
password
 

busy